If a small muck loader works in a coal mine, then it must meet the conditions for use in the coal mine and the relevant procedures and certificates before it can be operated in a coal mine. Let’s briefly introduce it today.
Please read the manual of the muck loader carefully before installing, debugging and using the muck loader.
1. The driver of the muck loader must undergo strict training and be certified.
2. During the use and maintenance process, the regulations in the maintenance manual of the muck loader must be strictly followed.
3. The supporting products of this machine that belong to the safety mark control management must have a safety mark certificate within the validity period. If it is replaced during use, it must also be the same.
4. During the installation, commissioning, use and maintenance of the muck loader, it is strictly forbidden to stand within the radius of rotation of the large and small arms. When repairing or filling grease, the pressure point of the oil cylinder must be protected and supported.
5. The cables must be strictly protected to avoid water, impact, squeeze and burst. Every shift must be inspected to find damage and deal with it in time. ,
Only qualified personnel of the muck loader are allowed to install and operate this equipment. In this manual, qualified personnel are those who are authorized to install, debug, use, and maintain in accordance with existing safety regulations and standards.