A more than 1 million boring machine, do deep processing of the bed, do out of the accessories precision plus or minus a few silk, want to make the equipment is good also want to out of the good products, maintenance of the bed to play the butter is an important part of the process. There is a proverb called three parts of the tunnel mucking loader seven parts of the maintenance, three parts of the posture of seven parts of the makeup. Visible maintenance for a piece of mucking loader how important.
China Coal mucking loader in the details is to strive for excellence, each pin are heat-treated to ensure his toughness and strength, to ensure her service life, the pin in the middle of the copper sleeve, between the copper sleeve is all graphite between, even if you do not play the grease, graphite is also lubricated on its own, to better extend the life of the pin.
Each pin has a greasing position. Let's grease the grease nipples once per shift. Three shifts a day will play three times the grease, just like three meals a day to eat three meals, a meal does not eat feel almost like what.
To give an example, a mucking machine to let two people open, Zhang San after work quickly withdrew, told Li Si said, I left work and forgot to hit the butter, you will hit the butter, Li Si after work is also hurried to leave, and told Zhang San said, I also did not hit the butter, you will go to work to remember to hit the butter, in this way, you push me, I push you, in January, the boss to buy a bucket of butter is still full, none of them are willing to hit the butter! I'm sorry, but I'm not going to do it. That is two monks have no water to drink. How to make playing butter it, work early, off duty can not go, two people together to play the butter to leave and go to work, so you can better maintain the tunnel mucking loader.
Muck loader grease nozzle location more, and not good to play yellow, sometimes need us to swing arm to play oil. Each movable joint part has a grease nipple. Each cylinder has two grease nipples, like the slave drum 308 bearings, bucket connecting plate, the size of the arm bucket connection, the gantry and slewing seat connection, the hydraulic drum behind the rotating parts of the front axle direction tie rod, vertical axis pin, double universal cross joints, drive shafts are on the grease nipple, we have to feed him on a regular basis his grease. Well this is my mucking machine plus grease a little insight.