Have you seen the tunnel mucking loader? This kind of machinery is very common in industrial buildings, and its birth has provided great convenience for the industry. Why do you say that? The tunnel mucking loader is mainly composed of a backhoe mechanism, a transport tank, a traveling mechanism, a frame assembly, a motor oil pump assembly, a hydraulic operating system, and an electrical system. Applicable gauges are 600 mm, 762 mm, 900 mm, and the radius of the curve should be greater than 12 m. The temporary rail of the work site should be 38 Kg/m or 43 Kg/m. The length is 2.5~3m, and the front end of the rail is made of steel sleepers (channel steel), which is fastened by the clamping plate and is firm and reliable. The working site is required, the water level is lower than the rail surface, and the drainage of the working surface is required to be good. In order to prevent the whole machine from operating in the roadway, the distance between the center of the track and the wall of the roadway is required to be no less than 1000mm. The ground and track should be flat and should not sink. Seeing this, I believe everyone knows why Xiaobian said this. Today, Xiaobian will tell you how to use it.

1. When the tunnel mucking loader is working, at least three or three turns of wire rope should be left on the drum.

2, the stacking in front of the feed trough should not be too high, the stacking in the tank should not be too much, in order to prevent the winch overload and coalgangue, the bucket jumped out of the trough caused an accident.

3. The wire rope (especially the empty rope) of the bucket during the slag slag is easy to swing, and a reliable protection device is required on the driver's side.

4. The driver should send a signal to the attention of others before driving. When slag is slag, the bucket is not allowed to stand or perform other work within the range of the round trip.

5. Avoid tightening the two operating handles at the same time to prevent the bucket from flying.

6. When the tunnel mucking loader is blocked or overloaded during the shale process, it should not be forcibly towed. The bucket should be retracted and then smashed.

7. After the slag is finished, the bucket should be opened to the chute, and then the tail wheel unloaded from the head will be placed in the bucket to prevent the rock from being buried after the shot.

8. Remove the anti-glare lights hanging on the head before placing the guns, and place them under the trough to prevent damage.

9. After the shot is fired, the tank, cable, anti-skid device, etc. should be inspected before driving.