ban
Position:Home  /  Product Wiki  /  Crawler Mucking Loader Disassembly Step

Crawler Mucking Loader Disassembly Step

Date:2019-09-18     Label:

Crawler Mucking Loader

Muck Rock Loader

Mucking Loader

For these large-scale machines, great care must be taken during installation and disassembly. Accidents may occur at any time, so the correct procedure should be followed when disassembling the crawler mucking loader.

(1) The disintegration of the crawler mucking loader is completed in the ground mine equipment warehouse, and the lifting device during the disintegration uses the crane in the warehouse of the mining equipment.

(2) When disintegrating, it must be commanded by a staff member, and should not be dismantled at will to ensure construction safety.

(3) When the crawler mucking loader is dismantled, disassemble it into parts according to the provisions of the maintenance manual. The bolts, washers, pins, etc. of each part should be properly kept, and the sub-packaging and distribution system should be implemented to prevent loss or damage.

(4) The parts under the disassembly of the crawler mucking loader should be handled lightly, and the inner screw holes should be plugged with cotton yarn plugs, and the precision parts such as plugs should be packaged to prevent damage during transportation.

(5) During the disassembly and disassembly process, when lifting the crawler mucking loader parts, it is strictly forbidden to stand under the boom.

(6) When removing the fuel tank, first clean the dirt around the fuel tank mouth with kerosene to prevent the dirt on the parts from entering the oil port.

(7) When the fuel tank is disassembled, the operator does not allow the bag gloves to prevent the fibers from entering the port.

Crawler Mucking Loader Disassembly Step

+

+

Please leave a message
skype
message