1. Keep the tunnel mucking loader clean, and adjust and fasten loose parts in time to prevent the parts from being worn or loosening or loss of parts.
2. After the break-in period, the tunnel mucking loader should be maintained for inspection and adjustment, and pay attention to the replacement of the oil filter.
The tunnel mucking loader loads 80 cubic meters, 100 cubic meters, 120 cubic meters, 150 cubic meters, 180 cubic meters, 200 cubic meters, 220 cubic meters, 260 cubic meters, 312 cubic meters, 330 cubic meters of ordinary and large slope types per hour; gear pumps And high-pressure pumps; electric and oil-electric dual-use; explosion-proof type; tire-type, rail-type, tracked models. The tunnel mucking loader changed the semi-mechanization of the original construction.
The tunnel mucking loader is mainly used for coal mines, phosphate mines, iron mines, copper mines, gold mines, silver mines, lead-zinc mines and other mines and tunnel projects such as railways, highways, water conservancy, and anti-collision mining in narrow space mining operations Stone material collection and loading, as well as open-air bulk material loading operation. The advanced mining equipment, which is essential for mining enterprises, replaces manual operations and loads various slag and stone materials after blasting onto transportation vehicles. It is a substitute product for labor and other machinery, and fills the gap of no mechanical operations in narrow spaces.