Your Name
Phone
E-Mail Address
Country
Tunnel Mucking Equipment Electric Mucking Loader is a four-tire-driven wheel type slag-removing machine for loading mines and rocks in underground mining and tunneling. With its mighty driving ability
Contact Us Product CenterTunnel Mucking Equipment Electric Mucking Loader is a four-tire-driven wheel type slag-removing machine for loading mines and rocks in underground mining and tunneling. With its mighty driving ability, it runs between mine rubble and rubble, and continuously works for 24 hours and digs and collects, Loading, clear the end of five functions go hand in hand.
Loading capacity per hour according to the size of the design of the slag machine, 30 type 1 hour loading 30 cubic meters, 40 type 1 hour loading 40 cubic meters, 50,60,80,100,120,160 type are all based on Custom vehicle loading capacity.
Main Parameter of
Item |
Unit |
Data |
Machine length |
mm |
5800 |
Machine width |
mm |
1700 |
Machine height |
mm |
1550 |
Axial distance |
mm |
1550 |
wheelbase |
mm |
1480 |
The size of the maximum material (long * height * width) |
mm |
450*700*450 |
Walk away from the ground |
mm |
240 |
Machine weight |
kg |
≈3100 |
Material maximum lift height |
mm |
2100 |
Loading height |
mm |
2200 |
Loading car length |
mm |
2200 |
Hopper height |
mm |
2000 |
power consumption |
kw/h |
21 |
Turn angle |
(o) |
76 |
Walk speed |
km/h |
3—6 |
Grilled machine efficiency |
m3/h |
80 |
Conveying slope |
(o) |
24 |
Stretching length |
mm |
≈7300 |
Material length |
mm |
1800 |
Your Name
Phone
E-Mail Address
Country
Enquiry